Project Name | Hangzhou Chemical factory BESS project, China |
Application | Peak Shifting |
BESS Capacity | 8.20MWh |
Annual Charge/Discharge | Around 4,500,000kwh |
Benefit | Saving electric bill over RMB 1 Mil (around US$140,000) annually |
ROI Period | 3.50 Years |
Solution | 22x M372L BESS cabinets +2x Control Cabinet+ AC cabinet/transformer container +BESS grid-connected cabinet + Cloud platform |
Post time: Oct-31-2024